Horizontal Directional Drilling
Fibre optic rollout in Krefeld
Date
May 2023
Type of installation
Telecommunications
Pipe
Fibre Optic
Drilling length
1100m
Soil
Class 1 – 3
Location
Stock
Horizontal directional drilling, reaming to 180 mm and a total length of 1,100 metres for the installation of fibre optic cabling in Stock, Krefeld.
Between October and November 2023 in Krefeld, specifically in the Stock sector, we carried out a Horizontal Directional Drilling combined with a 180 mm reaming, achieving a total length of 1,100 metres and finishing with the installation of fibre cabling using the blow method.
The result? A modern, efficient infrastructure that is ready to meet the current and future connectivity demands of the area.
Technology and precision underground
The terrain, classified between class 1 and 3, offered ideal conditions for carrying out the project using the horizontal directional drilling method, ensuring precision and maximum control, guaranteeing subsoil stability, pipeline safety and efficiency in execution times.
The combination of scoring and drilling techniques was essential to achieve a safe, continuous and uninterrupted route, reducing environmental impact and preserving the urban environment and existing infrastructure.
This method enabled the agile and reliable deployment of the network, meeting the highest standards of quality, safety and sustainability.
The success of the project demonstrates how technological innovation and strategic planning can go hand in hand to build more resistant, durable and environmentally friendly underground infrastructure.
Connectivity for a growing city
The installation of the fibre optic network reinforces development, ensuring that the city has an infrastructure that is ready for the digital future and capable of adapting to technological advances in the coming years.
This project consolidates Krefeld’s position as a connected, modern and sustainable city, ready to continue growing without compromising the quality of life of its citizens.
Commitment to quality and the future
The project in Krefeld reaffirms our commitment to technical excellence, operational efficiency and respect for the environment.
We demonstrate that the implementation of advanced technology in underground infrastructure not only improves connectivity, but also optimises resources and reduces environmental impact.
At Catalana Drilling, we continue to work to ensure that each project is an opportunity to innovate and build a more sustainable future for the communities in which we operate.